WHB Engineers

County of San Diego

2016

Description: The Otay Crossings Commerce Park Sewage Pump Station will service the new Otay Crossing development located in East Otay Mesa. The lift station includes a 7700 gallon wet well with a 15,000 gallon emergency storage manhole and two 15 HP lift pumps each capable of 275 gpm of sewage flow. Brady provided electrical and control systems design, including power, controls, site lighting, grounding, and maintaining County SCADA standards to maintain consistency across all facilities.

Latest Projects