County of San Diego
2016
Description: The Otay Crossings Commerce Park Sewage Pump Station will service the new Otay Crossing development located in East Otay Mesa. The lift station includes a 7700 gallon wet well with a 15,000 gallon emergency storage manhole and two 15 HP lift pumps each capable of 275 gpm of sewage flow.
WHB Engineers provided electrical and control systems design, including power, controls, site lighting, grounding, and maintaining County SCADA standards to maintain consistency across all facilities.
Latest Projects
Engineering Resilience: How Modern Water Infrastructure Protects Our Communities
Water infrastructure is largely invisible — until it fails. WHB...
Read MoreFrom Groundwater to the Tap: The Hidden Engineering Behind Reliable Water Supply
What does it take for clean water to travel from...
Read MoreLaguna Beach School District – Water Quality Management Plan
WHB Engineers was selected by a commercial compost facility to...
Read MoreEvergreen Nursery Soil Percolation Testing
WHB Engineers was selected by a commercial compost facility to...
Read More