Contra Costa College
008 (Design) 2012 (Construction)
Services: Environmental & Permitting
WHB’s operating company to support Verizon’s general permit compliance.
WHB supported Verizon in getting City of San Diego and State of California environmental permitting for 14 miles of customer-owned fiber conduit undergrounding in San Diego.
Permit Required Documents (PRDs) were prepared by a WHB Qualified SWPPP Developer and uploaded to the SMARTS database in collaboration with site owners.
The project has since obtained a State of California CGP for the LUP Type-1 project.
Each construction crew was trained by a WHB QSP to implement stormwater BMPs on their sites.
To date, WHB personnel have performed over 40 inspections and prepared and submitted two permit amendments.
All PRDs are reviewed by the local municipality and the regional water quality control board for approval and permitting.
WHB also provides ongoing SMARTS database management and quality control to support to Verizon Communication Inc. for this program.
Latest Projects
Laguna Beach School District – Water Quality Management Plan
WHB Engineers was selected by a commercial compost facility to...
Read MoreEvergreen Nursery Soil Percolation Testing
WHB Engineers was selected by a commercial compost facility to...
Read MoreSan Pasqual Valley Soils Groundwater Protection
WHB Engineers was selected by a commercial compost facility to...
Read More