WHB Engineers

New Science Center, Contra Costa College

WHB Engineers provided construction management for Contra Costa College’s Science Center. The project spanned four phases, emphasizing comprehensive oversight from pre-construction to project closeout.

Natoma Oaks – Land Development

In the realm of land development, Natoma Oaks stands as a testament to collaboration. Guided by former public servants, we navigated intricate regulations for a high-end home project. Overcoming challenges like protected creek beds and dormant landslides, our team prioritized environmental sustainability, pioneering bioretention in the town’s landscape evolution.

Huntingon Beach – Well 13

WHB Engineers has extensive experience in water design. In 2012, WHB Engineers , the operating company for the City of San Diego, completed the design of Huntington Beach’s Well No. 13 Chlorine Storage Building, enhancing safety and environmental efficiency.

Brine Line Project – Harmony Grove to Broadway

WHB Engineers managed the $5.59M Brine Line Project for the City of Escondido, overseeing 2.3 miles of pipeline construction, including trenchless sections, compliance enforcement, and environmental mitigation measures.

Concrete Improvements Project

In 2023, the Concrete Improvements Project for the City of Pacifica focuses on over 50 locations, ensuring ADA compliance, repairing degraded concrete, and coordinating seamlessly with a concurrent asphalt overlay project.

ESA Secondary Connection

The ESA Secondary Connection Project for Padre Dam Municipal Water District spanned 2016-2019, valued at $14.7M. WHB Engineers managed complex construction, coordinating with multiple agencies and stakeholders for vital water infrastructure enhancement.

As-Needed Construction Management Services San Diego

WHB Engineers excelled in a 5-year as-needed construction management contract with the San Diego County Water Authority, spanning 2014-2023, valued at >$50M. Notable projects include Nob Hill Improvement and Pipeline 3 Relining.

Alvarado Trunk Sewer

WHB Engineers has provided construction management and inspection services to the City of San Diego Public Works Field Division, supporting City staff on a variety of capital improvement projects.

WHB Engineers Resident Engineers and inspectors interfaced as the main point of contact with the contractor, representing the City’s Field Division in coordination with various city departments, governmental agencies, and the community.

City of Oceanside Pier Utility Replacement

WHB Engineers served as the Engineer of Record for the utility replacement for the City of Oceanside’s Municipal Pier. WHB Engineers conducted an initial study for the City to determine the feasibility for replacing potable/firewater and electrical systems due to operation issues the City was experiencing with the water system.

In addition, WHB Engineers was responsible for plan preparation of the replacement of the existing combined domestic/firewater pipes and the replacement for the pier’s sewer force main and three sewer sump systems. This project also consisted of electrical upgrades, a new handrail, and refurbishment and upgrades to structural components. WHB Engineers developed contract documents, including basis of design reports, plans, specifications, calculations, and cost estimates.

Oceanside Harbor Fishing Pier Emergency Repairs

In response to critical structural issues discovered in the 2021 Harbor Condition Assessment, emergency repairs were initiated at Oceanside Harbor Fishing Pier, ensuring its temporary functionality until replacement.