WHB Engineers

Pioneering Electrical Engineering Solutions

Empowering Projects with Expert Electrical Design and Implementation

Electrical Engineering

Electrical engineering for infrastructure is the practice of designing and implementing safe and successful electrical components in construction projects. Electrical engineers work closely with other professionals, including architects, civil engineers, and other project professionals.

At WHB, our electrical engineers are led by licensed professionals who have experience with the design and installation of a wide variety of electrical project components from power systems to low-voltage systems such as security and communications. Our electrical engineers are responsible for the safe and efficient execution of electrical design and installation of electrical equipment.

In an increasingly data-driven world, WHB team members work with our clients on the monitoring of their systems and the collection and analysis of the collected materials.  For example, WHB staff members are part of the team monitoring the City of San Diego wastewater collection and treatment system, with WHB staff working side by side with City staff at their central monitoring facility.

WHB has specific experience in electrical for infrastructure, from full electrical design of water and wastewater collection, distribution, and treatment facilities to Supervisory Control and Data Acquisition (SCADA) systems to simple arc flash studies.

We bring an integrated approach to these services in the overall project design that few firms of any size can match.

Local-Power-Utility2
WHB Engineers has a long history of successfully executing projects for local power utility company, San Diego Gas and Electric.
Kilroy OP 1
Biotech Site Design offers Civil, Structural, and Electrical Engineering services. WHB Engineers is the Civil Engineer of Record for major
ESA Secondary Connection
The ESA Secondary Connection Project for Padre Dam Municipal Water District spanned 2016-2019, valued at $14.7M. WHB Engineers managed complex
As-Needed Construction Management Services
WHB Engineers has provided construction management and inspection services to the City of San Diego Public Works Field Division, supporting
As-Needed Engineering Support and Pier Utility Replacement (2)
WHB Engineers served as the Engineer of Record for the utility replacement for the City of Oceanside’s Municipal Pier. WHB
Electrical Controls
Since 2013, WHB Engineers has delivered Electrical and Controls As-Needed Services to the San Diego County Water Authority, showcasing expertise
Pure Water Electrical Design-san diego
The City of San Diego has initiated a Pure Water project that will use proven water purification technology to clean
Mayfield Booster Pump Station
The Mayfield booster pump station (BPS) was originally constructed in 1970 and had reached the extent of its expected service
Otay Crossings Commerce Park Sewage Pump Station
Otay Crossings Commerce Park's Sewage Pump Station, serving the East Otay Mesa's new development, features a 7700-gallon wet well, 15,000-gallon