City of Oceanside
2021-2022
Description: During the 2021 Condition Assessment of the Harbor, WHB Engineers identified severe defects and structural deficiencies at the Harbor Fishing Pier. As a result, the pier was closed and emergency repairs were planned so the pier could remain open until it is replaced.
WHB Engineers was responsible for plan preparation, design of repairs, construction support services, and coordination with the contractor.