WHB Engineers

Civil Engineering,  Environmental & Permitting

WHB Engineers was hired to author permit required documents (PRDs) for permit activation including a notice of intent (NOI) and Technical Report detailing site conditions. 

As part of the Technical Report, WHB conducted soil percolation testing and reporting of hydraulic soil surface conditions around active compost areas and detention basins. WHB was also responsible for creating and implementing a Groundwater Protection Monitoring Plan including the design, installation and monitoring of new onsite groundwater wells as well as existing site wells.

Latest Projects