WHB Engineers was tasked with both strengthening an existing tank as well as designing a new 7.5 MG circular, prestressed concrete tank and pump station improvements. The City was concerned that their current tank could potentially fail after a similar design in another jurisdiction made headlines in 1998 with a catastrophic failure.
WHB Engineers managed the design for temporarily strengthening the original tank by installing steel strands along the exterior upper and lower areas of the tank.
WHB Engineers then prepared the plans, specifications, and estimates for a new tank designed in accordance with California Building Code, ASCE 7, AWWA D110. WHB Engineers was responsible for completing both the structural design along with EI&C, mechanical, and water quality.
Latest Projects
Why California’s Water Infrastructure Needs More Than Just Engineers
California has the largest state economy in the United States, yet...
Read MoreWHB Engineers Appoints Kevin Phelps, CPA, as Chief Financial Officer
Announcement WHB Engineers Appoints Kevin Phelps, CPA, as Chief Financial...
Read MoreEngineering Resilience: How Modern Water Infrastructure Protects Our Communities
Water infrastructure is largely invisible — until it fails. WHB...
Read MoreFrom Groundwater to the Tap: The Hidden Engineering Behind Reliable Water Supply
What does it take for clean water to travel from...
Read More