WHB Engineers

Projects

A showcase of projects telling a story of creativity collaboration and our journey toward a sustainable future

In the realm of land development, Natoma Oaks stands as a testament to collaboration. Guided by former public servants, we
WHB Engineers has extensive experience in water design. In 2012, WHB Engineers , the operating company for the City of
WHB Engineers managed the $5.59M Brine Line Project for the City of Escondido, overseeing 2.3 miles of pipeline construction, including
In 2023, the Concrete Improvements Project for the City of Pacifica focuses on over 50 locations, ensuring ADA compliance, repairing
The ESA Secondary Connection Project for Padre Dam Municipal Water District spanned 2016-2019, valued at $14.7M. WHB Engineers managed complex
WHB Engineers excelled in a 5-year as-needed construction management contract with the San Diego County Water Authority, spanning 2014-2023, valued
WHB Engineers has provided construction management and inspection services to the City of San Diego Public Works Field Division, supporting
WHB Engineers served as the Engineer of Record for the utility replacement for the City of Oceanside’s Municipal Pier. WHB
In response to critical structural issues discovered in the 2021 Harbor Condition Assessment, emergency repairs were initiated at Oceanside Harbor
WHB Engineers was tasked with both strengthening an existing tank as well as designing a new 7.5 MG circular, prestressed