WHB Engineers

Water Projects

A showcase of WHBEngineers' most exciting and innovative projects. Each one tells a story of creativity, collaboration, and our journey towards a sustainable future.

  • Reset
WHB Engineers has extensive experience in water design. In 2012, WHB Engineers , the operating company for the City of
WHB Engineers has provided construction management and inspection services to the City of San Diego Public Works Field Division, supporting
WHB Engineers served as the Engineer of Record for the utility replacement for the City of Oceanside’s Municipal Pier. WHB
In response to critical structural issues discovered in the 2021 Harbor Condition Assessment, emergency repairs were initiated at Oceanside Harbor
WHB Engineers was tasked with both strengthening an existing tank as well as designing a new 7.5 MG circular, prestressed
WHB Engineers conducted a seismic assessment for the City of Redlands. The City of Redlands selected WHB Engineers to complete
This study included the assessments, inspection, analysis, design upgrades, and cost-estimates for 45 water storage facilities including 22 steel tanks
The Mayfield booster pump station (BPS) was originally constructed in 1970 and had reached the extent of its expected service
Otay Crossings Commerce Park's Sewage Pump Station, serving the East Otay Mesa's new development, features a 7700-gallon wet well, 15,000-gallon
WHB Engineers successfully revamped Fountain Valley's Reservoir No.2 and Pump Station in 2016, replacing an outdated pump station, enhancing aesthetics,